Handoyo, Handoyo (2009) Analisis Pengukuran Waktu Standart Untuk Optimalisasi Jam Kerja Mesin Pada CV. Rajawali Mega Jember. Undergraduate thesis, Universitas Wijaya Putra.
0220000000184.pdf
Download (32MB)
Official URL: https://repository.uwp.ac.id/id/eprint/2435
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Teknik > Teknik Industri |
| Department: | S1 - Teknik Industri |
| Depositing User: | Perpustakaan UWP |
| Contributors: | Contribution Name NIDN Email Thesis advisor Budiono, Budiono UNSPECIFIED UNSPECIFIED |
| Date Deposited: | 21 Apr 2025 04:02 |
| Last Modified: | 21 Apr 2025 04:02 |
| URI: | https://repository.uwp.ac.id/id/eprint/2435 |

